How long does a building project take?

People often ask how long the building will take. A better question is how long everything takes, from first idea to the last coat of paint.

The phases

A project has design, approvals, preparation and ordering, the build and the finishing. The build is often the shortest part, and the earlier phases can be several months.

Typical build times

A refurbishment usually takes two to six weeks on site. A loft conversion typically takes 6 to 10 weeks. A single-storey extension typically takes 10 to 16 weeks. These are guides, not promises.

What slows things down

Planning decisions, Building Control queries, long glazing lead times, hidden problems when walls are opened and weather during groundworks and roofing. Late changes by the client are the most avoidable delay.

Booking and lead times

Good builders are booked ahead. Ask when a realistic start date is, and be wary of promises to start tomorrow.

How we plan

We give a programme with the quote, say which parts depend on others, and tell you promptly if something changes.

Free site visit and quote

Tell us about the project at hello@walmerbuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.

Thinking about a project? Let's look at the house.

Free, no-obligation site visit and quote. Tell us what you are planning, send photos if you have them, and we will arrange a time to come and see it.